PROJECTS Business Units
ALL PROJECTS
ONGOING
COMPLETED
OTHER PROJECTS
Interconection Comahue- Cuyo northern section and subsections (LICCSA)
Commissioning Party: Trust Fund Management Committee
Location: Argentina.
Construction and installation of 188.4 km of 500 kV single-circuit transmission line, expansion of the Gran Mendoza 500 kV Transformer Station, and construction of the Rio Diamante 500/220 kV Transformer Station. Additionally, the project includes the expansion of the Los Reyunos 220/132 kV Transformer Station, construction of 7 km of 220 kV single-circuit high-voltage line, and the main and backup communication systems for control and automation.
Completion of the project: 2011
Location: Argentina.
Construction and installation of 188.4 km of 500 kV single-circuit transmission line, expansion of the Gran Mendoza 500 kV Transformer Station, and construction of the Rio Diamante 500/220 kV Transformer Station. Additionally, the project includes the expansion of the Los Reyunos 220/132 kV Transformer Station, construction of 7 km of 220 kV single-circuit high-voltage line, and the main and backup communication systems for control and automation.
Completion of the project: 2011
Interconection sections NEA- NOA, eastern section (LINSA)
Commissioning Party:Norte Grande Electric Transmission Program
Location: Argentina.
The project includes the expansion of the Resistencia 500 kV Transformer Station, construction of the new Gran Formosa 500/132 kV Transformer Station, and the construction of the 500 kV high-voltage transmission line (LEAT) between the Resistencia Transformer Station and Gran Formosa Transformer Station, approximately 160 km in length.
Completion of the project: 2010
Location: Argentina.
The project includes the expansion of the Resistencia 500 kV Transformer Station, construction of the new Gran Formosa 500/132 kV Transformer Station, and the construction of the 500 kV high-voltage transmission line (LEAT) between the Resistencia Transformer Station and Gran Formosa Transformer Station, approximately 160 km in length.
Completion of the project: 2010
Rincón Santa María Rodriguez Interconection, 3rd. Section (LIMSA)
Commissioning Party: Execution Committee for the Rincón Santa María-Rodríguez Interconnection
Location: Argentina.
Construction, operation and maintenance of the Rincón Santa María-Rodriguez Interconnection of the third section of the 500 kV Transmission System, associated to the Yacyretá hydroelectric power plant, Northern Sub-section.
Completion of the project: 2008
Location: Argentina.
Construction, operation and maintenance of the Rincón Santa María-Rodriguez Interconnection of the third section of the 500 kV Transmission System, associated to the Yacyretá hydroelectric power plant, Northern Sub-section.
Completion of the project: 2008
Yacyretá hydroelectric power transmission plant- 500 kv (LITSA)
Commissioning Party: Execution Committee for the Rincón Santa María-Rodríguez Interconnection
Location: Argentina.
Construction of a transmission line of 593 km, including a 500 kV single-circuit line of 508 km in length and a 500 kV single-circuit line of 85 km in length. Expansion of a transformer station with four fields of 500 kV, one 500/132/33 kV transformer with 300/300/100 MVA capacity, a new transformer station with six equipped 132 kV fields, and expansion of a transformer station with a field of 500 kV equipped with two 80 MVAr reactor banks.
Completion of the project: 2008
Location: Argentina.
Construction of a transmission line of 593 km, including a 500 kV single-circuit line of 508 km in length and a 500 kV single-circuit line of 85 km in length. Expansion of a transformer station with four fields of 500 kV, one 500/132/33 kV transformer with 300/300/100 MVA capacity, a new transformer station with six equipped 132 kV fields, and expansion of a transformer station with a field of 500 kV equipped with two 80 MVAr reactor banks.
Completion of the project: 2008