Skip to content

Brigadier Lopez Thermal Power Plant. Combined Cycle Closure
ENSENADA, BUENOS AIRES. ARGENTINA

140

MW Installed capacity

120

km of electrical wiring

140

tn of metallic structure

510

tn of mechanical equipment

800.000

MAN-HOURS

Execution of the EPC project for the combined cycle closure of the Brigadier López Thermal Power Plant in Santa Fe province, which increases generation capacity by 140 MW, providing power to more than 300,000 households across the country.