COMMISSIONING PARTY: Execution Committee for the Rincón Santa María-Rodríguez Interconnection
Location: Argentina.
Construction of a transmission line of 593 km, including a 500 kV single-circuit line of 508 km in length and a 500 kV single-circuit line of 85 km in length. Expansion of a transformer station with four fields of 500 kV, one 500/132/33 kV transformer with 300/300/100 MVA capacity, a new transformer station with six equipped 132 kV fields, and expansion of a transformer station with a field of 500 kV equipped with two 80 MVAr reactor banks.
Completion of the project: 2008