Barragán Thermal Power Plant. Combined Cicle Closure
ARGENTINA
280
MW of installed capacity
900
tn of mechanical equipment
850
tns of metallic structures
110
km of electrical wiring
and instrumentation
- PRINCIPAL: Pampa Energía S.A. YPF LUZ S.A.
- SEGMENT: ENERGY
- Completion of the project: 2023
- Completed
Execution of an EPC project in the province of Buenos Aires, which includes the installation of two heat recovery steam generators (HRSGs), a steam turbine (ST), and a 280 MW generator, increasing electrical generation capacity by 50%.