Skip to content

Barragán Thermal Power Plant. Combined Cicle Closure
ARGENTINA

280

MW of installed capacity

900

tn of mechanical equipment

850

tns of metallic structures

110

km of electrical wiring
and instrumentation

Execution of an EPC project in the province of Buenos Aires, which includes the installation of two heat recovery steam generators (HRSGs), a steam turbine (ST), and a 280 MW generator, increasing electrical generation capacity by 50%.