Combined Cycle Closure of the Ezeiza Thermal Power Plant
ARGENTINA
150
MW of installed power
5,000
tons of mechanical equipment
500
tn of metallic structures
320
km of electrical wiring
and instrumentation
- PRINCIPAL: Generación Mediterránea S.A.
- SEGMENT: ENERGY
- Beginning of the project: 2021
- Completed
Execution of a project that includes construction engineering, procurement of the BoP, construction, commissioning, and assistance with startup. The combined cycle closure of the Thermal Power Plant adds 150 MW, through the installation of a 54 MW gas turbine, four HRSG boilers, and two 44 MW steam turbines.