Western Region Sewer System – Section 1
Client:
National Entity for Waterworks and Sanitation
Location: Buenos Aires, Argentina
Description: Execution of 23 km of main collectors to convey sewage effluents. The project included all civil, mechanical, electrical works, and an automation system for the pumping station. It also involved the installation of 750 meters of 900mm diameter force main pipeline, a surge protection system, and an overflow pipeline.
Completion of the Project: 2007
Location: Buenos Aires, Argentina
Description: Execution of 23 km of main collectors to convey sewage effluents. The project included all civil, mechanical, electrical works, and an automation system for the pumping station. It also involved the installation of 750 meters of 900mm diameter force main pipeline, a surge protection system, and an overflow pipeline.
Completion of the Project: 2007
Principal: AYSA S.A.
Client:
AYSA S.A.
Location: Buenos Aires, Argentina
Description: Execution of an EPC (Engineering, Procurement, and Construction) project that includes the installation of a transformer substation for low-voltage service feed, trench laying of feeder and industrial control cables, panels, generator set, automation system, and commissioning of the necessary equipment for four treatment modules. Each module has the capacity to treat a volume of effluents equivalent to 150,000 inhabitants.
Completion of the Project: 2013
Location: Buenos Aires, Argentina
Description: Execution of an EPC (Engineering, Procurement, and Construction) project that includes the installation of a transformer substation for low-voltage service feed, trench laying of feeder and industrial control cables, panels, generator set, automation system, and commissioning of the necessary equipment for four treatment modules. Each module has the capacity to treat a volume of effluents equivalent to 150,000 inhabitants.
Completion of the Project: 2013
Provincial Route No. 20 Stage 1
Client:
National Road Administration
Location: Santa Fe, Argentina
Description: Construction of Section 1B, a 44 km highway. It includes the construction of new basic infrastructure, paved roadway and shoulders, concrete culverts, embankments of varying heights, installation of metal guardrails, and construction of new bridges and viaducts.
Completion of the Project: 2013
Location: Santa Fe, Argentina
Description: Construction of Section 1B, a 44 km highway. It includes the construction of new basic infrastructure, paved roadway and shoulders, concrete culverts, embankments of varying heights, installation of metal guardrails, and construction of new bridges and viaducts.
Completion of the Project: 2013
Provincial Route No. 20 Stage 1
Client:
National Road Administration
Location: Villaguay, Entre Ríos, Argentina
Description: Construction of Stage 1, which includes the execution of the intersection with National Route No. 18, in the town of Villaguay, heading north to Entre Ríos with Provincial Route No. 22.
Beginning of the Project: 2021
Location: Villaguay, Entre Ríos, Argentina
Description: Construction of Stage 1, which includes the execution of the intersection with National Route No. 18, in the town of Villaguay, heading north to Entre Ríos with Provincial Route No. 22.
Beginning of the Project: 2021