El Tambolar
SAN JUAN, ARGENTINA

75

MW INSTALLED POWER CAPACITY

605

HM3 RESERVOIR VOLUME

11,800,000

M3 GROUND EXCAVATION

Detailed engineering, procurement, and construction of a concrete face rockfill dam (CFRD) with a 113 m height over its foundation and a 450-m crest length; spillway with outlet channel, 2.7 km intake channel; engine house with 2 Francis turbines (installed capacity: 2 x 37.5 MW = 75 MW), transformer substation, high-voltage line, and supplementary works.