75
MW INSTALLED POWER CAPACITY
605
HM3 RESERVOIR VOLUME
11,800,000
M3 GROUND EXCAVATION
-
PRINCIPAL:
Energía Provincial Sociedad del Estado (E.P.S.E.) - SEGMENT: INFRASTRUCTURE AND SANITATION
- 2019-ONGOING
Detailed engineering, procurement, and construction of a concrete face rockfill dam (CFRD) with a 113 m height over its foundation and a 450-m crest length; spillway with outlet channel, 2.7 km intake channel; engine house with 2 Francis turbines (installed capacity: 2 x 37.5 MW = 75 MW), transformer substation, high-voltage line, and supplementary works.