El Mangrullo Field Expansion: Gas Treatment Plant PTG-2
ARGENTINA

4,8

MM SM3/D of gas processing capacity

1.100

tns of erection of mechanical equipment

200

tns of metalic structures

800.000

MAN HOURS

Execution of a project comprising the development of engineering, supply of equipment and materials, construction and start-up of a gas treatment and compression plant which will include high and medium pressure separation, compression, filtration and dehydration. The project was executed in a single stage to reach a processing and compression capacity of 4.8 MM Sm3/d.