El Mangrullo Field Expansion: Gas Treatment Plant PTG-2
ARGENTINA
4,8
MM SM3/D of gas processing capacity
1.100
tns of erection of mechanical equipment
200
tns of metalic structures
800.000
MAN HOURS
- PRINCIPAL: Energía Argentina S.A.
- SEGMENT: oil and gas
- Completion of the project: 2023
- Completed
Execution of a project comprising the development of engineering, supply of equipment and materials, construction and start-up of a gas treatment and compression plant which will include high and medium pressure separation, compression, filtration and dehydration. The project was executed in a single stage to reach a processing and compression capacity of 4.8 MM Sm3/d.