Skip to content

El Mangrullo Field Expansion: Early Production Facility
ARGENTINA

700.000

Sm3/d total gas processing capacity

200

tns of equipment

90

tns of metalic structures

Execution of a project in El Mangrullo field, Neuquén province, which includes the development of engineering, supply of equipment and materials, construction and start-up of a gas treatment and compression plant as well as primary separation, compression, filtration and gas dehydration treatments.