Sierra Chata Field Expansion Gas Pipeline and Fiscal Metering Station
ARGENTINA

100

MMm3/d of flow rate

24

km in 24´´and 4 km in 16´´

300.000

MAN HOURS

Construction of a gas pipeline, surface facilities and a fiscal metering station (EMED). The pipeline has a total length of 24 km of 24'' and 16'' and the EMED has three exit lines, with a transport capacity of 100 MMm3/d at a pressure of 129 kg/cm2.