Fértil Pampa
41
months of execution
80
hectares of industrial complex
6.000
metric tons per day of granular urea, distributed across two identical trains
- PRINCIPAL: Pampa Energía S.A
- SEGMENT: oil and gas
- Beginning of the project: 2026
- Under Execution
Execution of an industrial complex for the production of ammonia, urea, and granular urea. The facility will be developed in Ingeniero White, within the Bahía Blanca Industrial Complex, Province of Buenos Aires. SACDE’s scope includes engineering, procurement, construction, commissioning, start-up, and performance testing of all facilities required for fertilizer production.
Previous
Next
Notas relacionadas
Techint y SACDE ya están construyendo el Oleoducto Vaca Muerta Oil Sur (VMOS)
VMOS S.A., el consorcio conformado porlas principales empresas de energía de Argentina , adjudicó a la UT Techint - SACDE la construcción del proyecto de infraestructura energética más significativo del país de los últimos 50 años.
VMOS: la UT Techint – SACDE realizó la primera soldadura automática en línea regular
El proyecto Vaca Muerta Oil Sur (VMOS) alcanzó un nuevo hito en las cercanías de Chelforó, provincia de Río Negro, Argentina. Allí se realizó la primera soldadura automática en la traza de 437 km de extensión.