Brigadier Lopez Thermal Power Plant. Open Cycle
ENSENADA, BUENOS AIRES. ARGENTINA

292

MW Installed capacity

920

tn of mechanical equipment

610

tn of metallic structures

70

km of electrical wiring and instrumentation

2.500.000

MAN-HOURS

The EPC project includes engineering, procurement of equipment and materials, construction, assembly, and commissioning of the open cycle of the Thermal Power Plant with an additional capacity of 292 MW.