Brigadier Lopez Thermal Power Plant.
Open Cycle
ENSENADA, BUENOS AIRES. ARGENTINA
292
MW Installed capacity
920
tn of mechanical equipment
610
tn of metallic structures
70
km of electrical wiring and instrumentation
2.500.000
MAN-HOURS
- PRINCIPAL: Energía Argentina S.A.
- SEGMENT: ENERGY
- Completion of the project::2013
- Completed
The EPC project includes engineering, procurement of equipment and materials, construction, assembly, and commissioning of the open cycle of the Thermal Power Plant with an additional capacity of 292 MW.