Rincón de Aranda Field
ARGENTINA
5
EPC PROJECTS
7.500
Sm³/d of processing capacity
- PRINCIPAL: Pampa Energía S.A.
- SEGMENT: oil and gas
- Beginning of the project: 2024
- Under Construction
The scope of the EPC works includes engineering, end-to-end supply chain management, construction, mechanical assembly, pre-commissioning, commissioning support, and start-up support. The field development plan involves a Central Processing Facility with a crude processing capacity of 7,000 Sm³/d, as well as the installation of a 30 km gas pipeline with an estimated operational flow rate ranging from 100,000 to 500,000 Sm³/d. Additionally, an oil pipeline spanning 36 km will be installed. SACDE has also completed the construction of three water storage reservoirs, each with a capacity of 100,000 m³, along with supporting infrastructure such as the connection of new well pads and injection/production wells via flowlines.
Neuquén
Notas relacionadas
NUEVOS PROYECTOS EN EL YACIMIENTO RINCÓN DE ARANDA
Estamos avanzando con la ejecución de proyectos estratégicos para la extracción y transporte de petróleo en el bloque Rincón de Aranda, operado por Pampa Energía S.A., cercano a la localidad de Añelo en la provincia de Neuquén.