Perito Moreno gas pipeline
transport capacity expansion
14
MM3/D INSTALLED
1
STRATEGIC LOGISTICS CENTER
8
PROJECTS SIMULTANEOUSLY
- PRINCIPAL: : TRANSPORTADORA DE GAS DEL SUR S.A.
- SEGMENT: oil and gas
- Beginning of the project: 2025
- Under Construction
The project consists of expanding the transport capacity of the Perito Moreno Gas Pipeline (GPM). The planned capacity-expan sion works for this trunk pipeline involve incorporating new addi tional compressor stations at several points along the route and upgrading the existing facilities. This will enable an increase of up to 14 million cubic meters per day, allowing the GPM to reach a maximum operational transport capacity of up to 40 million cubic meters per day. The scope includes the construction of three new compressor stations—Chacharramendi (La Pampa), Doblas (La Pampa), and Ordoqui (Buenos Aires)—as well as an additional compressor unit in Tratayén (Neuquén). Together, these will provide a combi ned installed power of 90,000 horsepower (HP).
Notas relacionadas
Techint y SACDE ya están construyendo el Oleoducto Vaca Muerta Oil Sur (VMOS)
VMOS S.A., el consorcio conformado porlas principales empresas de energía de Argentina , adjudicó a la UT Techint - SACDE la construcción del proyecto de infraestructura energética más significativo del país de los últimos 50 años.
VMOS: la UT Techint – SACDE realizó la primera soldadura automática en línea regular
El proyecto Vaca Muerta Oil Sur (VMOS) alcanzó un nuevo hito en las cercanías de Chelforó, provincia de Río Negro, Argentina. Allí se realizó la primera soldadura automática en la traza de 437 km de extensión.