Perito Moreno gas pipeline
transport capacity expansion

14

MM3/D INSTALLED

1

STRATEGIC LOGISTICS CENTER

8

PROJECTS SIMULTANEOUSLY

The project consists of expanding the transport capacity of the Perito Moreno Gas Pipeline (GPM). The planned capacity-expan sion works for this trunk pipeline involve incorporating new addi tional compressor stations at several points along the route and upgrading the existing facilities. This will enable an increase of up to 14 million cubic meters per day, allowing the GPM to reach a maximum operational transport capacity of up to 40 million cubic meters per day. The scope includes the construction of three new compressor stations—Chacharramendi (La Pampa), Doblas (La Pampa), and Ordoqui (Buenos Aires)—as well as an additional compressor unit in Tratayén (Neuquén). Together, these will provide a combi ned installed power of 90,000 horsepower (HP).

Planta de procesamiento de gas de Tratayén Neuquén