Combined Cycle Closure of the Ezeiza Thermal Power Plant
ARGENTINA
150
MW of installed power
5,000
tons of mechanical equipment
500
tn of metallic structures
320
km of electrical wiring
and instrumentation
- PRINCIPAL: Generación Mediterránea S.A.
- SEGMENT: ENERGY
- Beginning of the project: 2021
- Completed