Skip to content

Bypass Road section from El Tropezón Distributor to Spilimbergo Avenue
CÓRDOBA, ARGENTINA

500,000

m3 of excavation

340,000

m3 of embankment

30,000

m3 of concrete

Construction of 4 km of concrete roadways with three lanes in each direction, collector streets, roundabouts, a bridge over the main roadways 1.05 km in length, and significant hydraulic works.