Skip to content

North & South Vaca Muerta Gas Pipeline
Vaca Muerta, Neuquén. Argentina

147,4

km in 30´´ and 36´´

1,000,000

MAN-HOURS

Construction of a 147.4 km long gas pipeline with a 30" diameter and a 36" diameter in the province of Neuquén, crossing thirty production areas in Vaca Muerta. The pipeline allows for capturing a flow of up to 60 MMm³/d by injecting gas into the Central West and NEUBA II pipelines.