147
KM GAS PIPELINE
36"
DIAMETER
1,055,000
MAN-HOURS
- PRINCIPAL: TGS S.A.
- SEGMENT: GAS AND OIL
- 2018 -2019
Execution of a total 147.2 km 30” and 36” diameter gas pipeline with a 97 Kg/cm2 pressure that will allow for capturing a flow of up to 60 MMm3/day, injecting the gas production into the Central-Western and NEUBA II pipelines and expanding the gas market scale. North-South Vaca Muerta is the largest gas pipeline executed in the country over the last 10 years.
Reproducir vídeo