Skip to content

Gas Andes Gas Pipeline and Transfer Stations Region VI
ARGENTINA

54

km in 20´´ diameter
Gas pipeline Section 1

20

km in 6´´ diameter
Gas pipeline Section 2

270.000

tns of mechanical equipment

1.200.000

MAN HOURS

Construction and engineering of a 74 km-long gas pipeline, out of which 54 km are 20” in diameter and 20 km are 6” in diameter. The route begins at the Gas Andes main pipeline in Pirque, a municipality in the Santiago Metropolitan Region, Chile, and continues along the Andean foothills from El Peral station to the mining settlement of Caletones, part of the El Teniente Division of CODELCO.