280
MW CAPACITY INCREASE
1,300
STAFF PEAK
2,000,0000
MAN-HOURS
- PRINCIPAL: YPF Luz - Pampa Energía S.A.
- SEGMENT: ENERGY
- 2019-ONGOING
Barragán Thermal Power Plant’s conversion to combined cycle. Power generation capacity increase to 840 MW. The EPC project contemplates basic and detailed engineering, procurement, installation, testing, and commissioning of the power plant. The works include the installation of two heat recovery steam generators (HRSG), a steam turbine (ST), and a 280 MW generator.