Thermal Power Plant Ensenada Barragán
ENSENADA, BUENOS AIRES. ARGENTINA

280

MW CAPACITY INCREASE

1,300

STAFF PEAK

2,000,0000

MAN-HOURS

Barragán Thermal Power Plant’s conversion to combined cycle. Power generation capacity increase to 840 MW. The EPC project contemplates basic and detailed engineering, procurement, installation, testing, and commissioning of the power plant. The works include the installation of two heat recovery steam generators (HRSG), a steam turbine (ST), and a 280 MW generator.