El Tambolar Multi-Purpose Hydroelectric Installation
ARGENTINA
343
GWh annual generation
of clean and renewable energy
70
MW of power
6.100.000
MAN HOURS
- PRINCIPAL: Energía Provincial Sociedad del Estado
- SEGMENT: ENERGY
- Beginning of the project:2019
Construction, engineering, and supply of a CFRD (Concrete-Faced Rockfill Dam) in the province of San Juan, with a height of 113 m above the dam foundation, a crest length of 450 m, spillway with a discharge channel, a 2.7 km intake tunnel, a powerhouse with two Francis turbines (70 MW capacity), a transformer station, high-voltage transmission line, and ancillary works.