El Tambolar Multi-Purpose Hydroelectric Installation
ARGENTINA

343

GWh annual generation
of clean and renewable energy

70

MW of power

6.100.000

MAN HOURS

Construction, engineering, and supply of a CFRD (Concrete-Faced Rockfill Dam) in the province of San Juan, with a height of 113 m above the dam foundation, a crest length of 450 m, spillway with a discharge channel, a 2.7 km intake tunnel, a powerhouse with two Francis turbines (70 MW capacity), a transformer station, high-voltage transmission line, and ancillary works.