Caleta Paula Terminal Facility
ARGENTINA
30
pumps installed
250
tns of steel
270
tns of mechanical equipment
650.000
MAN HOURS
- PRINCIPAL: Petrobas S.A.
- SEGMENT: oil and gas
- Completion of the project: 2007
- Completed
Execution of an EPC project that includes detailed and construction engineering, procurement of equipment and materials, construction and assembly, pre-commissioning, assistance with commissioning, and startup of the plant located in Río Gallegos, Santa Cruz province.